Page 5 of 5
30+
years in industrial and commercial construction management ·
Project Controls Manager for Process Engineering and Procurement
scopes for multi-billion-dollar greenfield industrial plant ·
Forensic Scheduling Consultant – Delay Analysis, Claims Preparation
and Defense ·
Coordinator/Integrator of multi-company schedules in P6 enterprise
environment ·
Project Controls Manager for international heavy manufacturing company
during construction of new facility ·
Operations Manager for construction scheduling consulting firm for
General Construction ·
Project Controls Manager for Construction Management organization for
Manufacturing, Brewing, and Pharmaceutical clients ·
Construction Engineer, Contracts Administrator, Cost Engineer, Claims
Specialist and Technical Writer for Fortune 100 owner’s engineering and
construction management division ·
Developer of complex custom database applications ·
Regional Manager in Virginia for St. Louis-based industrial general
contractor ·
Project Manager/Estimator for commercial general contractors Employment History AREVA, 2009-present Senior Project Manager for Project Controls and
Scheduling, AREVA NP, Engineering and Projects Division. Responsible
for development, maintenance and integration of schedules for process
engineering, equipment procurement, and vendor-assisted commissioning for new
process facility. Engineering effort in excess of 1 million design and
procurement hours in US and Europe; equipment procurement approximately $600
million. Integrated design, procurement, and commissioning schedule
rolls into owner’s integrated project schedule that includes building design,
construction, and owner’s commissioning program. Supervising
international team of schedulers (peaked at 5, down to 2). Also
responsible for earned value management system and key performance indicator
(KPI) reporting. Eagle Rock Enrichment Facility; to be built in Idaho;
engineering managed from Charlotte, NC. Project slowed during economic
slow-down. Project Controls Manager, AREVA-Newport News, LLC, June
2009 to June 2011. Owner’s scheduling and cost manager for joint
venture between Northrop Grumman Shipbuilding and AREVA, to erect and start a
manufacturing facility for heavy components for commercial nuclear power
plants. Responsible for development and management of project controls
program, including cost control processes, earned value management program,
and total program schedule development using Primavera Project Planner
version 6.2. Project suspended due to market conditions; transferred to
project above. Independent Consultant,
2009-2012 Scheduling Consultant in post-project dispute
and settlement negotiation. Performed delay analysis, presented
contractor’s side in request for equitable adjustment (REA) presented to the
US Army Corps of Engineers. Settlement achieved; entire 211-day delay
accepted by Corps. Quality Planning Solutions
(subsidiary of Turner Construction), 2004-2009 Operations Manager, Internal Consultant: Responsible
for coordinating efforts of team of schedulers providing project scheduling
services to projects throughout the United States for major commercial and
industrial general contractor. Also provided senior claims consulting
services. Responsible for development and maintenance of schedules for
a variety of projects of all sizes, and for providing trouble-shooting
assistance, delay analyses, and claims services on an as-needed basis.
Projects to date have covered wide range, including pharmaceutical plants,
hospitals, schools, and high-rise luxury condominiums. September 2004 to June
2009. Suitt
Construction, 2003-2004 Project Controls Manager: Responsible for
development and maintenance of schedule and cost systems to be used on
construction portion of $700+ million insulin production and packaging
facility for Eli Lilly and Company in Prince William County, Virginia.
Supervised staff that created construction piece of total Primavera schedule;
coordinated integration of total project schedule, adding engineering,
procurement and commissioning. Participated in selection and
implementation of Prolog as site cost system. Developed a database for
conversion of multi-source project estimate into searchable and transportable
database. Prepared total staff of 9 for significant construction
project that was ultimately cancelled. April 2003 to September 2004. J.A. Jones Construction (and
subsidiaries) 1999-2003 Project Scheduling Manager, J.A. Jones Engineering
and Construction/Lockwood Greene Engineering. Responsible for all
schedule development and forecasting associated with $180 million
pharmaceutical project for Bristol Myers Squibb in New Brunswick, New
Jersey. August 2001 to March 2003. Project Controls Manager, J. A. Jones
Construction/Lockwood Greene Engineering, Responsible for all cost and
schedule forecasting and other project controls functions associated with the
construction of a new North American Stability Laboratory and a major plant
expansion for Merck Pharmaceuticals at their Wilson
NC site; combined construction budgets totaling $80 million. Supervised staff
of 2 schedulers, 2 cost engineers. Prepared monthly reports; presented cost
and schedule information to client's senior management. Developed
network-based custom database application for creating and processing
subcontract change orders through an intricate approval process, providing
real-time data for project cost reports; continuously in use since February
2000. September 1999 to July 2001. Scheduling Manager, J.A.
Jones Technologies Group,.
Responsible for engineering, procurement, construction, and validation
schedules for new process MK-826 at the Merck Chemicals Cherokee Facility in
Danville, Pennsylvania. Work included converting conceptual schedules
to detailed construction schedules, and issuing weekly schedule
updates. Supervised one scheduler and three quantity-tracking
engineers, and coordinated information flow from process engineering, design
engineering, superintendents, procurement personnel, and contractors. January-August,
1999 Anheuser Busch Corporate
Engineering, 1989-1999 Construction Engineer, Jacksonville, Florida,
Williamsburg, Virginia, and Baldwinsville, New York. Owner’s
representative overseeing a variety of construction projects, including
packaging line modifications, warehouse additions and modifications, and
brewing process piping changes. Additional responsibilities included
third-party pre-legal analysis of contractor claims. In addition, wrote
Standard Operating Procedures for new bottle line installed in the
Jacksonville, Florida brewery. Mid-1997 - December 1998 Regional Manager / Project Manager for industrial
general contractor on Anheuser-Busch Projects, HS Construction, St.
Louis, Missouri. Responsible for all work performed in local area
(Williamsburg, Va.) by out-of-state contractor during two-year performance
period. Work was performed by union labor in a multi-prime environment,
requiring extensive coordination and cooperation with owner’s
representatives, other contractors, and labor; work performed in accordance
with Anheuser-Busch safety, environmental, and security standards.
Responsibilities and accomplishments included: ·
Managing construction of four major building projects, two packaging
modifications, and a series of miscellaneous architectural/civil/structural
projects. ·
Administration of 9 prime contracts and over 30 subcontracts over
two-year period. ·
Development of procedures and systems for document and change control
to match Owner’s and home office’s administrative systems; assembly,
installation, and maintenance of computer network for this purpose. ·
Supervision of staff including 3 project managers, 6 superintendents.
1995-1997 Project Controls Engineer for Anheuser-Busch
Corporate Engineering, Williamsburg Brewery, Williamsburg, Virginia,
under contract through Energy Services Group, Williamsburg,
Virginia. Local brewery expansions and work at remote sites
including 4 other breweries, a can plant, a bakery, and a snack foods
plant. Wrote scopes of work for and administered contracts for major
capital projects spread over five year period at the Williamsburg
brewery. Position grew to include administrative consulting at other
Anheuser-Busch sites, including user documentation and claims investigations
and defense preparation. ·
Maintained project schedules using Primavera Project Planner. ·
Devised standard procedure for developing bid packages, standard
language for scopes of work, computer-based tracking systems; adapted system
to monitor contract growth by cause, track time-and-material cost. ·
Participated in development of database for tracking contract costs
and change orders; created user documentation for Field Cost Management
System, company-wide system for Anheuser-Busch Companies. ·
Performed research and analyses for, and prepared owner’s defense
against contractor-claims from contractors working on projects at 4
sites. Armada/Hoffler Construction,
Chesapeake, Virginia, 1988-1989 Estimator for large-scale commercial developer
and general contractor in Chesapeake, VA. Estimated interior build-out
projects; handled bidding and-specifications for buildings; reviewed interior
designs for codes compliance; provided computer support to other divisions of
the company. 1988-1989 General Contractors, Newport
News, Virginia, 1986-1988 Project Manager for 2 small commercial general
contractors, C.A. Barrs Contractor, Incorporated, Yorktown, Virginia, and
Bowry Construction Company, Newport News, Virginia. Estimated, bid,
scheduled, and managed general construction projects. Developed
administrative systems for monitoring prime- and sub-contract draw requests
in both companies. 1986-1988. Newport News Industrial
Corporation, Newport News, Virginia, 1982-1986 Planner/Scheduler, Project Planner, Proposal
Coordinator for Newport News Industrial Corporation (NNI), a subsidiary
of Newport News Shipbuilding, Newport News, Virginia. NNI was a
general/mechanical contractor providing service to utility companies.
Provided planning and scheduling support; proposal preparation including cost
estimating; and contract claims support for various nuclear and
hydro-electric projects. 1982-1986 Professional
Affiliations and Education Member, Project Management
Institute (PMI) Member, American Association
of Cost Engineers (AACE) Certification: “Project
Management Professional” (PMP), Project Management Institute, 2011 Certification: “Scheduling
Professional” (SP), Project Management Institute, 2012 Master’s Program (ongoing),
Program and Project Management, Brandeis University Earned Value Management
Systems 3-day Workshop, Humphreys and Associates, 2011 Migrating from p3 to p6, Oracle
University, 2010 OSHA 30-Hour Course for
Construction Safety and Health, 2009 Effective User Documentation,
George Mason University, 1992 Mechanics’ Liens and Surety
Bonds under Virginia Law, The Cambridge Institute, 1991 Estimating for the General
Contractor, Center for Exec. Development, William & Mary, 1990 Project Scheduling for General
Contractors, Associated General Contractors, 1984 PROJECT/2 Outage Management,
Project Software & Development, Inc., 1983 The College of William and Mary,
BA, 1980 Who’s Who in American Colleges
and Universities, 1980